AMONT · PARIS FASHION WEEK OPERATING GUIDE

Paris Fashion Week showroom checklist

A Fashion Week showroom succeeds or fails in the details between the venue contract and the last handover photograph. This operational checklist covers the commercial brief, venue, insurance, access, furniture, internet, buyer appointments, installation, live days and deposit return. Use it as a working control document—not as a decorative planning article.

The complete Paris Fashion Week showroom checklist

Tick items in the browser as the project advances. Progress is saved on this device. Use “Print / save PDF” to create a clean working copy for the team.

Project readiness0 / 55 complete
01 · 12–20 weeks

Lock the commercial brief

The space comes after the objective.

02 · 8–14 weeks

Secure and verify the venue

Do not book from photographs alone.

03 · 4–8 weeks

Build the operating plan

Turn the room into a functioning showroom.

04 · 2–4 weeks

Fill the appointment calendar

A beautiful empty showroom is still an empty showroom.

05 · Final week

Install and stress-test

The final 48 hours expose every weak assumption.

06 · Live days + handover

Operate, document, close

The project is not finished when the last buyer leaves.

The project control folder

Keep one shared source of truth. Scattered WhatsApp messages and supplier emails are not an operating system.

D.01 · Commercial

Venue and payment

The complete commercial record for the occupation.

Signed contract and annexes
Final quote and payment schedule
Deposit amount and return process
Tax, commission and included services
D.02 · Risk

Insurance and permissions

Documents that determine whether the project can legally and practically operate.

Insurance certificate
Permitted use and capacity
Signage and façade approvals
Supplier insurance where required
D.03 · Space

Plans and condition

The reference for installation and handover.

Dimensioned floorplan
Furniture and lighting layout
Before-installation photographs
Access, lift and loading notes
D.04 · People

Contacts and responsibilities

Who answers, decides and intervenes.

Owner / venue manager
AMONT project contact
Client decision maker
Suppliers and emergency contacts
D.05 · Schedule

One live operating calendar

All activity must fit into one sequence.

Installation and deliveries
Daily staff and supplier rota
Buyer appointments
Cleaning, catering and dismantling
D.06 · Commercial

Buyer and product tools

The material that turns attendance into commercial action.

Buyer list and appointment status
Linesheets, lookbooks and order forms
Meeting notes and follow-up owner
Sample and stock tracking

Who should confirm what?

Responsibilities vary by contract, but every line needs one explicit owner. “We thought they handled it” is not a defensible operating plan.

Workstream
Venue owner
AMONT
Client
Supplier
Commercial terms + access
Confirms
Coordinates
Approves
Insurance + project information
Requirements
Checks
Provides
Provides own
Floorplan + showroom concept
Approves limits
Advises
Owns decision
Executes
Furniture, rails + lighting
Confirms existing
Coordinates scope
Approves quantities
Supplies / installs
Internet + technical systems
Declares existing
Flags risk
Defines need
Tests / supplies
Buyer calendar + sales materials
May advise
Owns
Cleaning, waste + reinstatement
Defines standard
Coordinates
Funds / approves
Executes
Condition report + keys
Participates
Coordinates
Participates
Clears scope

The contract overrides the table.

This matrix is a planning model, not a substitute for the signed venue agreement or supplier contracts. Confirm every owner, deadline, cost and approval in writing for the actual project.

AMONT · FAILURE CONTROL

Most showroom problems are predictable.

The expensive failures rarely come from obscure technical events. They come from assumptions that were never assigned, priced, tested or written down.

Booking the room before defining the commercial use.
Counting total area instead of usable showroom area.
Assuming access, furniture, Wi-Fi or cleaning is included.
Sending invitations before the appointment system is ready.
Testing internet or screens only when the team arrives.
Having no named person authorised to approve changes.
Leaving waste, keys and reinstatement until the final hour.
Treating deposit return as automatic instead of documented.

The final 48-hour opening kit

Small items consume disproportionate time when they are missing. Build one labelled box and keep it at reception or in the office.

PHYSICAL CONTROL · DO NOT SPLIT ACROSS TEN BAGS

Power + technology

  • Power strips and extension leads
  • French / international adapters
  • Phone and laptop chargers
  • Backup 4G / 5G connection
  • HDMI / USB-C adapters

Installation

  • Gaffer and removable tape
  • Scissors, cutter and basic tools
  • Cable ties and hooks
  • Measuring tape and level
  • Labels and marker pens

Operations

  • Printed schedule and contacts
  • Spare keys / access instructions
  • Appointment list and stationery
  • Water and hospitality reserve
  • Bin bags and cleaning basics

Commercial

  • Linesheets and order forms
  • Lookbooks and price lists
  • QR codes tested on site
  • Business cards / contact capture
  • Sample and stock log
AMONT OPERATING PRINCIPLE

A better brief creates a calmer Fashion Week.

Clear dates, use, audience, surface, budget, access and decision authority make the shortlist better—and prevent the venue from becoming the excuse for weak planning.

01 · Brief
Exact dates + access hoursSeparate installation, presentation and dismantling.
02 · Format
Use + audienceWholesale, press, retail, event or hybrid.
03 · Capacity
Usable surface + rail metresInclude circulation, storage and appointment space.
04 · Control
Budget + decision dateKnow the envelope and who can sign.

Related Paris showroom guides

Use the checklist after the commercial format is clear. These pages cover the venue, price and sourcing decisions that come before execution.

Frequently asked questions

Direct answers to the operational questions that appear before a Paris Fashion Week showroom opens.

When should I book a Paris Fashion Week showroom?

For a prime district, specific format or larger space, begin the search roughly three to five months before the required occupation. Smaller or more flexible briefs may be solved later, but the risk, price pressure and operational compromise increase as the official dates approach.

What dates should be included in the venue request?

Include installation, merchandising, team preparation, all live appointment days and dismantling. Also state the daily access hours, delivery windows and any evening use. A request containing only the public showroom dates is incomplete.

What documents are normally required?

Expect a signed contract, payment, security deposit and certificate of insurance. Depending on the venue and project, plans, supplier insurance, signage approval, capacity information or detailed production documents may also be required.

Is furniture, internet and cleaning included?

Not automatically. Existing rails, furniture, lighting, internet, utilities, daily cleaning and final cleaning vary by venue and commercial structure. Confirm quantities, specifications and cost in writing rather than relying on photographs or assumptions.

Who is responsible for inviting buyers?

The brand or showroom operator normally owns the buyer strategy, invitation, appointment calendar and commercial follow-up. A venue can improve access and brand perception, but it does not create buyer demand by itself.

How should the security deposit be protected?

Document the venue before installation, respect the agreed use, record issues during the occupation, complete a final clean and reinstate the space. Conduct a named handover with photographs and confirm the return or deduction process in writing.

Can this checklist replace the venue contract?

No. It is an operational planning tool. The signed venue agreement, supplier contracts, insurance requirements and written approvals define the real legal and commercial responsibilities for the project.

What should I send AMONT for a venue shortlist?

Send exact dates and access hours, project use, audience, preferred district, usable surface, rail and storage needs, technical constraints, total working budget and decision deadline. The clearer the brief, the more relevant the public and off-market options.

TALK TO A HUMAN · FAST ANSWER

Send the brief before the checklist becomes a rescue plan.

Tell Anselme the exact dates, audience, format, district, usable surface, operational needs, budget and decision date. AMONT can build a shortlist and flag the practical risks before the venue is signed.

Paris Fashion Week Showroom Checklist